Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Implementasi metode quick changeover untuk meminimalkan waktu setup di P.T.Z
Author
Suwandi, Daniel Ahendra
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Teknik Mesin Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 01011226/MES/2018
Subject(s)
ASSEMBLY-LINE METHODS
MANUFACTURING PROCESS
Notes
Appendix: p. 36-38
. Bibliography: p. 35.
Abstract
-
Physical Dimension
Number of Page(s)
vi, 38 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00873/18
(T) MES 1226
Library - 8th Floor
Available
Similar Collection
by author or subject
Analisa keseimbangan lintasan untuk kelancaran produksi dengan menggunakan promodel di C.V. Sinar Badja Electric
Penurunan total waktu dan line stop akibat abnormality pada proses dandori serta standarisasi kerja di area 1 dan 2 PT. Astra Otoparts Tbk. Divisi Adiwira Plastik
Engineering manufacturing processes in machine and assembly shops
Penentuan parameter menggunakan kernel estimator untuk menghitung capability index
LKP : PT Gunawan Dianjaya Steel Surabaya
Pembuatan sistem penghitungan Overall Equipment Effectiveness (OEE), pendataan downtime dan penerapan quick changeover untuk meningkatkan produktifitas di PT. Z
LKP : PT Gunawan Dianjaya Steel
LKP: PT. Wandira Kencana Alam Gresik