Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian jadwal pekerjaan finishing proyek rumah tinggal dengan metode Activity on Node (AON)
Author
Suhartono, MIchael Lorenzo
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2002954/1818
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012267/SIP/2018
Subject(s)
CONSTRUCTION INDUSTRY--MANAGEMENT
HOURS OF LABOR
SCHEDULING
Notes
Appendix: p. 50-109
. Bibliography: p. 49.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 109 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02954/18
(T) SIP 2267
Library - 8th Floor
Available
Similar Collection
by author or subject
Penjadwalan produksi dengan mempertimbangkan bottleneck di PT. Lestari Karya Makmur
Business continuity management in construction
Process improvement of glost selection to despactch department pt. doulton
LKP : PT Wijaya Indonesia Makmur Bicycle Jl. Raya Bambe Km 20 Driyorejo-Gresik
Algoritma branch and bound dan algoritma genetika untuk penjadwalan flowshop dengan fungsi tujuan ganda
The Breeden realty office building construction schedule
Analisa sistem penjadwalan produksi di CV. Sinar Baja Elektric
Penentuan rute dan penjadwalan kendaraan untuk pengiriman spon di CV. Prima Maju Jaya