Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian jadwal pekerjaan finishing proyek rumah tinggal dengan metode Activity on Node (AON)
Author
Suhartono, MIchael Lorenzo
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2002954/1818
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012267/SIP/2018
Subject(s)
CONSTRUCTION INDUSTRY--MANAGEMENT
HOURS OF LABOR
SCHEDULING
Notes
Appendix: p. 50-109
. Bibliography: p. 49.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 109 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02954/18
(T) SIP 2267
Library - 8th Floor
Available
Similar Collection
by author or subject
Model penilaian kepemimpinan manajer proyek yang diharapkan bawahan berdasarkan kriteria perilaku kepemimpinan
Perencanaan kebutuhan bahan baku dan penjadwalan produksi
Perencanaan peramalan dan penjadualan di PT Multi Global Makmur
Penjadwalan pengiriman barang di PT Simplot Agritama menggunakan algoritma genetika
Penjadwalan flowshop dengan mempertimbangkan batch size (studi kasus di PT X)
Project planning, scheduling, and control
Perancangan penjadualan pada departemen produksi di CV. Kayu Murni
Algoritma heuristik HFC untuk penjadwalan flowshop tanpa mempertahankan karakteristik permutation