Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian jadwal pekerjaan finishing proyek rumah tinggal dengan metode Activity on Node (AON)
Author
Suhartono, MIchael Lorenzo
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2002954/1818
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012267/SIP/2018
Subject(s)
CONSTRUCTION INDUSTRY--MANAGEMENT
HOURS OF LABOR
SCHEDULING
Notes
Appendix: p. 50-109
. Bibliography: p. 49.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 109 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02954/18
(T) SIP 2267
Library - 8th Floor
Available
Similar Collection
by author or subject
Penerapan petri nets dalam penjadualan dan optimasi dengan simulated annealing di PT 'X'
Penjadwalan sepatu boot berkaitan dengan ukuran dan warna di PT. Toboyo
Analisa sistem penjadwalan produksi dengan kombinasi metode apparent tardiness cost with setups (ATCS) dan first come first serve (FCFS) pada PT. Surabaya Perdana Rotopack
Perancangan sistem penjadwalan flexible flow line dengan ultimate buffers and setup di PT. Kerta Rajasa
Penjadwalan flowshop dengan mempertimbangkan batch size (studi kasus di PT X)
Business continuity management in construction
Penjadwalan produksi komponen produk paddy husker tipe head HC 6 BV di PT. Agrindo
Pengaruh schedule flexibility terhadap turnover intention dengan kepuasan kerja karyawan sebagai variabel perantara di Surabaya Plaza Hotel