Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Process improvement of glost selection to despactch department pt. doulton
Author
Toendan, Maria Natalia M.
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
English
ISBN
-
Series
Tugas Akhir No.04020919/IND/2005
Subject(s)
SCHEDULING
PRODUCTION PLANNING-QUALITY CONTROL
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
x, 108 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00832/05
(T) - 658.53 Toe P
-
Unavailable : Removed
Similar Collection
by author or subject
Prefabrication dan modular construction serta pengaruh precast terhadap scheduling proyek
Peningkatan kualitas produksi beton di PT. "X" (divisi beton)
Penjadwalan produksi dengan mempertimbangkan bottleneck di PT. Lestari Karya Makmur
Algoritma branch and bound dan algoritma genetika untuk penjadwalan flowshop dengan fungsi tujuan ganda
Penjadualan mesin paralel dengan metode dinamis fun (fuzzy-neuro) di PT Supra Aspindo Jaya
Penjadwalan produksi komponen produk paddy husker tipe head HC 6 BV di PT. Agrindo
Pengaruh schedule flexibility terhadap turnover intention dengan kepuasan kerja karyawan sebagai variabel perantara di Surabaya Plaza Hotel
Penjadwalan jobshop di CV Sinar Indah Teknik