Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis jumlah welder dan operatior welding preparation yang optimal untuk mengurangi bottleneck pada proses welding
Author
Kosasih, Agnes Yosephine
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 01022168/IND/2018
Subject(s)
PERSONNEL MANAGEMENT--RESEARCH
TIME STUDY
Notes
Appendix: p. 39-51
. Bibliografi: p. 37-38.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 51 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03301/18
(T) IND 01-2168
Library - 8th Floor
Available
Similar Collection
by author or subject
Perbaikan durasi dan pemenuhan task list aktivitas weekly cleaning pada mesin maker di PT X
Penurunan waktu weekly cleaning glue pot dan drum serta penetapan jumlah operator pada proses pembungkusan karton
Peningkatan kapasitas produksi pada divisi kalung lumakina kotak dengan metode line balancing dan methods time measurement di PT. Untung Bersama Sejahtera
Penjadwalan jobshop di CV Sinar Indah Teknik
Studi awal waktu pengecoran balok plat pada proyek bangunan bertingkat 6 lantai di Surabaya
Analisis lead time kontainer dengan simulasi value stream mapping di PT X
LKP : perusahaan mie cap burung elang Jl. Rantauan Darat 12 Banjarmasin 70243
Studi kelayakan perluasan pabrik rotan PT Bumi Rotan Jaya Mojosari