Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis jumlah welder dan operatior welding preparation yang optimal untuk mengurangi bottleneck pada proses welding
Author
Kosasih, Agnes Yosephine
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 01022168/IND/2018
Subject(s)
PERSONNEL MANAGEMENT--RESEARCH
TIME STUDY
Notes
Appendix: p. 39-51
. Bibliografi: p. 37-38.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 51 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03301/18
(T) IND 01-2168
Library - 8th Floor
Available
Similar Collection
by author or subject
Evaluasi waste dengan menggunakan konsep lean manufacturing di CV X
Perencanaan peramalan dan penjadualan di PT Multi Global Makmur
Distribusi chemical di finishing line PT. XYZ
LKP : proses produksi di PT Supra Aspindo Jaya
Peningkatan produktivitas dengan penetapan waktu kerja standar proses pembuatan sepeda
Analisis available time pada mesin A di PT. XYZ
Upaya peningkatan produktivitas dengan mengurangi waktu tidak produktif pada mesin slitter di PT. Spindo
Menurunkan jumlah cycle time di cam shaft line dengan cara menghilangkan muda di PT Toyota Motor Manufacturing Indonesia (PT TMMIN)