Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Evaluasi pelaksanaan QCL Assembly di PT. XYZ dengan mempertimbangkan ketersediaan waktu dan jumlah sampel
Author
Srikuning, Jonathan Kristiadi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 02022136/IND/2018
Subject(s)
QUALITY CONTROL
TIME MANAGEMENT
Notes
Appendix: p. 83-111
. Bibliography: p. 82.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 111 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03309/18
(T) IND 02-2136
Library - 8th Floor
Available
Similar Collection
by author or subject
Monitoring ISO 9001: 2008 PT Sentosa Alloy Industri, Sidoarjo
Penurunan prosentase cacat produk di PT.X
Pengendalian mutu dan analisa proses pembuatan gelas di PT Kedawung Subur Industrial Ltd Surabaya
Pemantauan dan evaluasi sasaran mutu untuk efektivitas implementasi sistem manajemen mutu ISO 9001:2015 di PT. X
Upaya peningkatan layanan Lippo Telecom dengan menggunakan metode GAP
Analisa loss produk dan pengendalian kualitasdi PT Sinar Sosro
Analisa kepuasan pelanggan di Mango Terrace Restaurant dengan metode servqual
Perbaikan mutu pada proses dan produksi spun-pile dengan menggunakan metode taguchi