Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : CV Pari Jaya Makmur Surabaya
Author
The Tjoen Phing
Additional Author(s)
-
Publisher
Surabaya: 1992
Language
Indonesian
ISBN
-
Series
Laporan Kerja Praktek : Mekanis
Subject(s)
MANUFACTURES
MANUFACTURING PROCESSES
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii,52p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00663/93
L 621.3 The L/M
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Effeciency improvement plan with kaizen methodology in pre-wiring and preparation station of SM6 line at PT Schneider Indonesia
LKP : proses kontrol seaming machine untuk tipe 201 di PT Indo Bali Desa Pengambengan, Negara, Bali
Improve metal shop process using lean six sigma at PT. Schneider Electric Indonesia
LKP : PT Dharma Satya Nusantara Jl. Kapt. Dharmo Sugondo Gresik
Perancangan business process dan sistem standard operating procedure di PT. Zensei Indonesia
LKP : CV Laksana Semarang
LKP : pabrik mesin rotar Surabaya
Implementasi material control system di departemen kawat-seksi drawing PT. Surabaya Wire