Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi penerapan keselamatan dan kesehatan kerja (K-3) dalam penggunaan tower crane pada proyek konstruksi
Author
Setiawan, Budi
Additional Author(s)
Febriangga, Alvius
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.30201431/SIP/2005
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
INDUSTRIAL SAFETY
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 107 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04963/05
(T) - 658.924 Set S
Library - 8th Floor
Under maintenance
Similar Collection
by author or subject
Pengaruh waktu curing, suhu curing dan aktivator terhadap kuat tekan mortar geopolimer berbahan dasar lumpur Sidoarjo
LKP : penggunaan microsoft access dalam pembuatan database yang diakses melalui erb dengan metode ASP (active server pages)
Upaya-upaya meningkatkan promosi Taman Kupu-kupu Bali
Pengaruh stimuli pemasaran pada supermarket Hero dan Superindo terhadap tingkat kunjungan konsumen
Studi tentang penggunaan jasa asuransi pada proyek konstruksi di Surabaya
Peningkatan penerapan kesehatan dan keselamatan kerja (K3) di lingkungan PT Santos Jaya Abadi Indonesia
Construction project administration
Studi kasus penerapan metode collapsed as-built terhadap sebuah bangunan perkuliahan di kota Surabaya