Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya perbaikan dengan meminimalisasi downtime PT. Surabaya Mekabox
Author
Ardiani, Enny
Additional Author(s)
Effendy, Ratnawati
Publisher
Surabaya: Fakultas Teknologi Industri , 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01040969/IND/2005
Subject(s)
PRODUCT MANAGEMENT
PRODUCTION CONTROL
PRODUCTION MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xi, 84 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00473/06
(T) - 658.56 Ard U
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa lead time produksi dan estimasi probabiltas kedatangan material dan produk import di PT. Schering-Plough Indonesia Tbk.
Assembly automation
LKP : CV Dwi Jaya
Upaya penurunan tingkat kecacatan di PT. Rejeki
LKP : PT Djajanti Universal Gresik
Product design and development
Analisa pengendalian persediaan bahan baku untuk memperlancar proses produksi pada Perusahaan Tegel Dewasa di Madiun
Perancangan sistem pengukuran dan peningkatan kinerja perusahaan di PT. Multipack Unggul