Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan sistem gudang sub material dan spare part pada depatemen teknik PT Surabaya Wire
Author
Kartawiyasa, Irsan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041045/IND/2006
Subject(s)
WAREHOUSES-MANAGEMENT
PRODUCTION PLANNING
MATERIALS MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xi, 44 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01609/06
(T) - 658.785 Kar P
-
Unavailable : Removed
Similar Collection
by author or subject
Studi perbandingan sistem dan prosedur di dalam manajemen material dengan manajemen bahan bangunan pada proyek konstruksi "X"
Pengendalian persediaan bahan baku guna menekan biaya persediaan bahan baku pada Perusahaan "X"
Penerapan tools integrasi perencanaan produksi pada departemen production planning and inventory control PT. FSCM Manufacturing Indonesia
Peningkatan efisiensi kerja dengan perancangan sistem PPIC di PT Tjandi Djaja Surabaya
Perancangan sistem perencanaan produksi dan persediaan bahan baku di CV. Sanyu Paint Indonesia
Penjadualan produksi ubin keramik single firing di PT Asia Victory Industri Ltd.
Perancangan sistem perencanaan produksi dan pengendalian persediaan bahan baku di pt. sarana graha ideal
Production planning and industrial scheduling