Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan produksi pada CV. Naga Jaya Plastics di Surabaya
Author
Linggosahputra, Kurnia
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01011065/IND/2006
Subject(s)
PRODUCTION SCHEDULING
PRODUCTION MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 58 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01634/06
(T) - 658.53 Lin P
-
Unavailable : Removed
Similar Collection
by author or subject
Sikap kerja 5S
Elements of production planning and control
Process improvement using mtm-uas analysis at switch assembly line in schneider electric Indonesia Ltd.
Manajemen dan pengembangan fungsi produksi dan operasional pada usaha pengelahan bahan kimia PT. X di Gresik
Pemakaian teknik keseimbangan kapasitas dalam pengambilan keputusan produksi yang paling menguntungkan pada Perusahaan Sandal Sponge "X"
Analisis quality control di bagian produksi pada PT Galaxy Perkasa
RSX production line analysis with line architecture design methodology in PT. Schneider Electric Manufacturing Batam
Analisa Penggunaan bahan baku filamen, faktor penyebab delay mesin lead in wire dan pembuatan rancangan sistem PPIC di PT. Cahaya Angkasa abadi sidoarjo