Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan pengukuran kinerja dengan pendekatan Malcolm Baldrige National Quality Award (MBNQA) modifikasi di PT Lestari Karya Makmur Surabaya
Author
Hardiman, Irene Anggreni
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.02041110/IND/2006
Subject(s)
PRODUCTION PLANNING
WORK MEASUREMENT
Notes
Appendix: p. 63 - 80
Bibliography: p. 62
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 80 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05794/06
(T) - 658.542 Har P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Upaya pemenuhan target produksi di PT Sidhakarya Anggawa Adipala
Perancangan metode dan fasilitas kerja di PT Niki Tunggal dengan menggunakan pendekatan ergonomi
Peningkatan kapasitas produksi pada divisi kalung lumakina kotak dengan metode line balancing dan methods time measurement di PT. Untung Bersama Sejahtera
Perancangan alat ukur penilaian kinerja biro kepegawaian sebuah universitas dengan pendekatan balanced scorecard dan baldrige scoring
Perancangan keseimbangan lintasan untuk meningkatkan kapasitas produksi pada perusahaan meja setrika
Upaya pencapaian target output mesin injeksi 7 dan penempatan material finishing pada storage area di PT. X
Perancangan keseimbangan lintasan untuk proses perakitan timbangan dengan menggunakan algoritma genetik pada perusahaan timbangan "SSS" di Surakarta
Manufacturing resource planning (mrp ii)