Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan pengukuran kinerja dengan pendekatan Malcolm Baldrige National Quality Award (MBNQA) modifikasi di PT Lestari Karya Makmur Surabaya
Author
Hardiman, Irene Anggreni
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.02041110/IND/2006
Subject(s)
PRODUCTION PLANNING
WORK MEASUREMENT
Notes
Appendix: p. 63 - 80
Bibliography: p. 62
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 80 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05794/06
(T) - 658.542 Har P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis komponen kritis supply chain management terhadap performance perusahaan
Production scheduling using backward scheduling method in job shop system study case at Schneider Indonesia Ltd.
Perencanaan kebutuhan kapasitas produksi di PT Bahari Mitra Surya
Penjadwalan produksi dengan mempertimbangkan bottleneck di PT. Lestari Karya Makmur
LKP : PT Glogarindo Surabaya
Peningkatan kinerja melalui implementasi rekomendasi peda pt. xyz dengan metode balanced scorecard.
Analisa pengendalian bahan baku pada depot mie dan lemper 168 di Surabaya
Perencanaan produksi di perusahaan "xxx"