Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan pengukuran kinerja dengan pendekatan Malcolm Baldrige National Quality Award (MBNQA) modifikasi di PT Lestari Karya Makmur Surabaya
Author
Hardiman, Irene Anggreni
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.02041110/IND/2006
Subject(s)
PRODUCTION PLANNING
WORK MEASUREMENT
Notes
Appendix: p. 63 - 80
Bibliography: p. 62
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 80 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05794/06
(T) - 658.542 Har P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengukuran kapasitas produksi di pt "xyz"
Studi kelayakan perluasan pabrik rotan PT Bumi Rotan Jaya Mojosari
Analisis perbandingan metode penjadwalan batch multi item dengan kombinasi algoritma tabu search dan ant colony (studi kasus pada CV Sinar Baja Electric)
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja bagian paper machine PT. Suparma Tbk Surabaya
Perbaikan penanganan pemindahan proses packaging paku
Perbaikan keseimbangan lintasan di lini produksi ecoss PT XYZ
Perancangan MRQ, pengontrolan persediaan material, dan pengiriman barang jadi di departemen planning PT. Filma Utama Soap
LKP : analisa tata letak pabrik perusahaan sepatu UD Happy Surabaya