Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus perencanaan alokasi kebutuhan bahan pada proyek konstruksi gedung kuliah dan poliklinik Universitas Kristen Petra
Author
Gahari, Alvin Agustinus
Additional Author(s)
Jayasasmita, Andy Surya
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20401522/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
MATERIALS-MANAGEMENT
Notes
Appendix: p. 95 - 99
Bibliography: p. 93 - 94
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 99 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00983/07
(T) - 658.924 Gah S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Workers participation in safety management system in construction projects in Thailand
Studi tentang faktor-faktor yang mempengaruhi perencanaan site layout proyek konstruksi di Surabaya
Approximate cost estimate berdasarkan kandungan besi dan kebutuhan bekisting pada struktur beton bertulang bangunan ruko (SOHO)
Faktor-faktor yang mempengaruhi kinerja (performance) sumber daya manusia di tingkat menengah (mid level) manajemen pada perusahaan jasa konstruksi di Surabaya
Analisis pemilihan kontaktor dalam mencapai kinerja proyek
Analisa durasi rencana aktivitas dan evaluasi pelaksanaan jadwal pada suatu proyek konstruksi gedung bertingkat (studi kasus pada proyek "X")
Produktivitas pengecoran beton ready-mixed dengan concrete pump dan tower crane (Studi Kasus: Proyek Ciputra World Surabaya)
Computer-based construction project management