Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus pembuatan shop drawing pada proyek grande water place residences phase 1 Surabaya
Author
Rachmawati, Ivonne
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011560/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
INDUSTRIAL PROJECT MANAGEMENT
Notes
Appendix: p. 115 - 118
Bibliography: p. 114
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 118 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03689/07
(T) - 658.924 Rac S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Faktor-faktor lapangan spesifik dan global yang menyebabkan keterlambatan pada tahapan pekerjaan struktur dan arsitek pada proyek berskala besar
Pengendalian jadwal pada proyek bangunan gedung bertingkat di Surabaya dengan metode earned value management dan earned schedule
Studi kasus produktivitas pekerjaan produksi dan pemasangan dinding precast pada proyek apartemen
Faktor-faktor yang mempengaruhi kinerja (performance) sumber daya manusia di tingkat menengah (mid level) manajemen pada perusahaan jasa konstruksi di Surabaya
Tingkat kepuasan penghuni dalam menempati apartemen sejahtera
Faktor-faktor yang mempengaruhi labor turnover dan dampaknya pada proyek konstruksi di Surabaya
Studi kasus aplikasi critical path method with multiple calendars pada proyek graha bukopin
Theory of constraints dalam manajemen konstruksi khususnya di bidang pelaksanaan pembangunan perumahan di Surabaya