Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor demotivasi pekerja dan dampaknya pada beberapa proyek konstruksi di Surabaya
Author
Wiyono, Fenny
Additional Author(s)
Chandra, Maria Christiana
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011549/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
MOTIVATION IN MANAGEMENT
Notes
Appendix: p. 68 - 106
Bibliography: p. 66 - 67
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 106 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03707/07
(T) - 658.314 Wiy F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Jenis pekerjaan yang mendominasi komposisi biaya pada proyek apartemen
Gambaran umum training pada site engineering manager kontraktor BUMN di Surabaya
Sistem jaminan kualitas dan biaya kualitas pada proyek tangki elpiji
Analisa sensitifitas penetapan harga proyek "X" dengan model fair and reasonable markup (FARM)
Kecelakaan kerja pada pekerjaan beton bertulang akibat faktor manusia
Analisa faktor yang mempengaruhi tahapan investasi pengembang perumahan
Model matematis hubungan kinerja konsultan dan komunikasi dalam proyek konstruksi
Standarisasi jenis pekerjaan dalam rab untuk pekerjaan struktur bangunan tinggi di Indonesia