Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor demotivasi pekerja dan dampaknya pada beberapa proyek konstruksi di Surabaya
Author
Wiyono, Fenny
Additional Author(s)
Chandra, Maria Christiana
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011549/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
MOTIVATION IN MANAGEMENT
Notes
Appendix: p. 68 - 106
Bibliography: p. 66 - 67
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 106 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03707/07
(T) - 658.314 Wiy F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Buildings and health
Perbandingan biaya struktur baja non-prismatis, castellated beam, dan rangka batang
The Breeden realty office building construction schedule
Toekomst van de kantorenmarkt 1994-2015
Sistem penjadwalan LSM untuk proyek instalasi pipa bawah tanah (studi kasus: fuel supply system, proyek pengembangan Bandara Juanda Surabaya)
Pengembangan elemen discrete kirchhoff midlin quadrilateral (DKMQ) untuk analisis pelat lipat komposit
Motivation and personality
Gambaran umum training pada site engineering manager kontraktor BUMN di Surabaya