Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Hubungan antara time overruns dan kepuasan konsumen menurut pendapat kontraktor dan pengembang pada proyek perumahan
Author
Boediono, Fransiska Dwi Yuniati
Additional Author(s)
Putri, Kezia Irwan Agus
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011552/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 88 - 124
Bibliography: p. 82 - 87
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 124 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03714/07
(T) - 690.068 Boe H
Library - 8th Floor
Available
Similar Collection
by author or subject
Sistem manajemen konstruksi
Pengaruh tindakan tidak aman (unsafe act) dan kondisi tidak aman (unsafe condition) terhadap kecelakaan kerja konstruksi
Analisis nilai produktivitas dan labor utilization rate tenaga kerja dengan metode work sampling
Menghitung umur penggantian berat yang optimum dengan biaya daur kehidupan yang minimum
Proporsi biaya tiap satuan pekerjaan struktur beton bertulang proyek konstruksi bangunan tinggi
Studi tentang faktor-faktor yang menentukan perencanaan strategi dalam perusahaan konstruksi
Studi joint risk management pada proyek konstruksi di Surabaya
Analisa konfik dalam perusahaan kontraktor