Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis produktivitas jam normal dan jam lembur pada pekerjaan struktur beton bertulang
Author
Palewana, Chrisnadi
Additional Author(s)
Siatanto, Kenny Laureans
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2012
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011830/SIP/2012
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Appendix : p. 42 - 85
Bibliography: p. 41
Abstract
-
Physical Dimension
Number of Page(s)
x, 85 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01886/12
(T) 690.068 Pal A
-
Unavailable : Removed
Similar Collection
by author or subject
Impacts of managerial and operational problems on facility layout arrangement in multi products precasting yards
Studi optimasi perencanaan site layout pada proyek konstruksi dengan menggunakan program quantitative system verson 3.0
Analisis kinerja waktu proyek sekolah "X" dengan metode performance intensity
Studi kasus produktivitas pekerjaan produksi dan pemasangan dinding precast pada proyek apartemen
Pengukuran efektifitas dan frekuensi faktor yang mempengaruhi produktivitas pekerja pada pekerjaan finishing proyek rumah tinggal di Surabaya
Pengaruh motivasi dan disiplin kerja terhadap produktivitas pekerja pada proyek X
Evaluasi faktor penyebab, kuantitas, akibat dan tindakan dari sisa material pada proyek rumah tinggal
Studi mengenai faktor-faktor yang dapat meningkatkan produktivitas konstruksi di Surabaya