Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi tentang produktivitas pekerjaan pasangan dinding setengah bata lantai dua pada proyek perumahan
Author
Stefanus, Andy Samuel
Additional Author(s)
Suryotomo, Rachmat
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011563/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Appendix: p. 71 - 113
Bibliography: p. 69 - 70
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 113 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00073/08
(T) - 690.068 Ste S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh kepercayaan terhadap kepuasan dan kesuksesan proyek konstruksi
LKP: Proyek ruko pakuwon city town square
Perhitungan percent plan completed dan identifikasi faktor tidak tercapainya rencana pekerjaan pada.
Penentuan produktivitas tenaga kerja pada proyek gudang struktur baja berdasarkan durasi pert (project evaluation review technique)
Construction management
Strategi sumber daya manusia untuk pekerja konstruksi (staf teknik)
Penerapan sistem manajemen lingkungan berdasarkan ISO 14000 pada kontraktor-kontraktor di Surabaya
Determining contractor selection criteria based in project types and project objectives