Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi tentang produktivitas pekerjaan pasangan dinding setengah bata lantai dua pada proyek perumahan
Author
Stefanus, Andy Samuel
Additional Author(s)
Suryotomo, Rachmat
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011563/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Appendix: p. 71 - 113
Bibliography: p. 69 - 70
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 113 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00073/08
(T) - 690.068 Ste S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP: Proyek ruko pakuwon city town square
Pengaruh kepercayaan terhadap kepuasan dan kesuksesan proyek konstruksi
Pengaruh kebijakan keselamatan dan kesehatan kerja (K3) terhadap kinerja tenaga kerja konstruksi pada PT. Wijaya Karya (persero) TBK. di proyek Tol Surabaya-Mojokerto
Total construction project management
Penentuan produktivitas tenaga kerja pada proyek gudang struktur baja berdasarkan durasi pert (project evaluation review technique)
Building management by professionals
Studi kasus terjadinya cacat konstruksi dengan pendekatan human error pada proyek gedung bertingkat
Studi material Pacitan, Madura dan Pandaan sebagai lapisan permukaan jalan