Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis keandalan peningkatan kapasitas gardu induk (GI) dengan menggunakan pembangkit listrik tersebar (PLT) pada jaringan distribusi 20 kv
Author
Kosasi, Hary Kurniawan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Elektro UK Petra , 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01010583/ELK/2008
Subject(s)
ELECTRIC TRANSFORMERS
Notes
Appendix
Bibliography: p. 202 - 203
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 203 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04656/08
(T) - 621.314 Kos A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Electric machinery and transformers
Handbook of power generation
Menurunkan tingkat arus harmonisa pada beban tak linier 3x1 fasa dengan kombinasi beban tak linier 1x3 fasa dan zig-zag winding
LKP : survey pada jalur gardu induk Rungkut gardu induk Surabaya Selatan
Studi koordinasi isolasi pada gardu induk konvensional di gardu induk Rungkut 150 KV
Studi tentang gardu induk yang menggunakan gas SF6 sebagai media isolasi
Perencanaan GIS (Gas Insulated Substation) Krembangan dalam rangka meningkatkan keandalan suplai daya listrik di daerah pelabuhan
Perencanaan dan pembuatan transformator zig-zag 127 v / 220 v, 270 va