Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Sistem administrasi shop drawing
Author
Alexandria H, Alan
Additional Author(s)
Wibowo S, Adi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011644/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
INDUSTRIAL PROJECT MANAGEMENT
Notes
Bibliography: p. 37
Abstract
-
Physical Dimension
Number of Page(s)
xi, 37 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00771/09
(T) - 658.924 Ale S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh sistem manajemen k3 terhadap waktu dan biaya proyek
Analisis biaya dan kemungkinan investasi rumah tipe di Citra Raya dan Wisata Bukit Mas
Manajemen risiko pada kecelakaan kerja di proyek konstruksi
Integrated project management
Penentuan produktivitas pekerja sebagai dasar penentuan upah (studi kasus pada proyek perkantoran)
Model pengukuran kemampuan manajer proyek berbasis kompetensi
Pengendalian pelaksanaan struktur gedung bertingkat untuk menghasilkan cara kerja yang efektip
Pengukuran efektifitas dan frekuensi faktor yang mempengaruhi produktivitas pekerja pada pekerjaan finishing proyek rumah tinggal di Surabaya