Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penyiapan sarana untuk evaluasi kemajuan proyek konstruksi
Author
Asih, Dewi Kurnia
Additional Author(s)
Kurniawan, Ronny
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011676/SIP/2009
Subject(s)
BUILDING ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 92 - 93
Bibliography : p. 90 - 91
Abstract
-
Physical Dimension
Number of Page(s)
xv, 93 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03241/09
(T) 692.5 Asi P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perhitungan percent plan completed dan identifikasi faktor tidak tercapainya rencana pekerjaan pada.
Hubungan overtime dengan produktivitas pekerjaan pembesian (studi kasus pada proyek x, y, dan z)
Construction productivity management
Pandangan konsultan perencana mengenai kualitas dokumen desain dan faktor-faktor yang mempengaruhinya
Studi literatur tentang constructability dalam proyek konstruksi
Survei kepuasan pengguna ruko terhadap jasa broker properti Surabaya
Studi tentang implementasi dan pendapat kontraktor terhadap program keselamatan kerja pada proyek mall di Surabaya
Analisa progress pekerjaan finishing pada proyek apartemen