Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan red time pada perakitan circuit breaker menggunakan video analisis di PT. Schneider Electric Indonesia
Author
Onggara, Ong Nico
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021422/IND/2010
Subject(s)
PRODUCTION ENGINEERING
TIME MANAGEMENT
Notes
Appendix : p. 35 - 80
Bibliography : p. 34
Abstract
-
Physical Dimension
Number of Page(s)
xi, 80 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02056/10
(T) 658.542 Ong P
-
Unavailable : Removed
Similar Collection
by author or subject
Manajemen waktu
Usaha peningkatan kapasitas produksi dengan metode lean manufacturing dan line balancing di PT. FSCM Manufacturing Indonesia plant 4
Dahulukan yang perlu didahulukan
Analisis peningkatan kapasitas produksi di PT "X" dengan metode simulasi
Peningkatan ketepatan pendataan line stop guna menurunkan loss time pada proses assembly drive chain dan cam chain di PT. XYZ
LKP : PG Rejo Agung Baru Madiun
Operations management
Pengurangan loading time di PT. X menggunakan simulasi