Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan red time pada perakitan circuit breaker menggunakan video analisis di PT. Schneider Electric Indonesia
Author
Onggara, Ong Nico
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021422/IND/2010
Subject(s)
PRODUCTION ENGINEERING
TIME MANAGEMENT
Notes
Appendix : p. 35 - 80
Bibliography : p. 34
Abstract
-
Physical Dimension
Number of Page(s)
xi, 80 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02056/10
(T) 658.542 Ong P
-
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan efisiensi man power melalui pencapaian line balancing dan perbaikan process flow pada spin on filter assembly line 2 di PT X
Evaluasi pelaksanaan QCL Assembly di PT. XYZ dengan mempertimbangkan ketersediaan waktu dan jumlah sampel
Macroergonomics for manufacturing systems
Perhitungan dan upaya peningkatan output rate di PT. X
Key to personal effectiveness (1)
LKP : PT Sentrabumi Palapa Utama Surabaya
LKP : PT Brother Silver Products Indonesia di Surabaya
Integrated product and process design and development