Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan red time pada perakitan circuit breaker menggunakan video analisis di PT. Schneider Electric Indonesia
Author
Onggara, Ong Nico
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021422/IND/2010
Subject(s)
PRODUCTION ENGINEERING
TIME MANAGEMENT
Notes
Appendix : p. 35 - 80
Bibliography : p. 34
Abstract
-
Physical Dimension
Number of Page(s)
xi, 80 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02056/10
(T) 658.542 Ong P
-
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan kapasitas produksi melalui penghitungan waktu baku, tata letak fasilitas, serta pemberian kompensasi di PT Surya Putra Barutama
LKP : gedung Kampus ITATS
Menentukan sistem perawatan mesin dengan mempertimbangkan faktor biaya di PT. X
Penetapan ratio kecepatan roll pada mesin extruder stretching untuk menetapkan kualitas benang
Product and furniture design
Project Professional 2010
Mengatur waktu secara efektif
Intelligent manufacturing and mechatronics