Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis pengurangan waiting time di lintasan original equipment manufacturing 1 PT Guntner Indonesia
Author
Setiawan, Ronny
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021445/IND/2010
Subject(s)
MANUFACTURING PROCESS
PRODUCTION MANAGEMENT
TIME STUDIES
Notes
Appendix : p. 36 - 50
Bibliography : p. 35
Abstract
-
Physical Dimension
Number of Page(s)
xii, 50 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03819/10
(T) 658.5 Set A
-
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh kualitas produk mie instant terhadap loyalitas konsumen melalui kepuasan konsumen mie instant di Surabaya
Hubungan trust, konmitmen, information sharing, dan information quality terhadap kinerja supply chain management retailer bahan bangunan di Surabaya
Principles of operations management
Penurunan perbedaan hasil antara perencanaan dengan aktual produksi spin on filter di PT X
Pengurangan downtime mesin offset dengan metode DMAIC di PT X
Penentuan parameter menggunakan kernel estimator untuk menghitung capability index
Enterprise resource planning systems
Perbaikan mutu pada proses dan produksi spun-pile dengan menggunakan metode taguchi