Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis pengurangan waiting time di lintasan original equipment manufacturing 1 PT Guntner Indonesia
Author
Setiawan, Ronny
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021445/IND/2010
Subject(s)
MANUFACTURING PROCESS
PRODUCTION MANAGEMENT
TIME STUDIES
Notes
Appendix : p. 36 - 50
Bibliography : p. 35
Abstract
-
Physical Dimension
Number of Page(s)
xii, 50 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03819/10
(T) 658.5 Set A
-
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh kualitas produk mie instant terhadap loyalitas konsumen melalui kepuasan konsumen mie instant di Surabaya
Pengurangan waktu proses intra transportasi menggunakan value stream mapping
ERP
Penentuan kombinasi faktor-faktor yang mempengaruhi kualitas sandal
Analisa lead time produksi dan estimasi probabiltas kedatangan material dan produk import di PT. Schering-Plough Indonesia Tbk.
Upaya peningkatan produktivitas dengan pengukuran kapasitas dan perancangan layout di PT FSCM Manufacturing Indonesia divisi kabel
Upaya peningkatan kapasitas produksi pada plong manual dan glueing manual di PT. X
Production systems