Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis pengurangan waiting time di lintasan original equipment manufacturing 1 PT Guntner Indonesia
Author
Setiawan, Ronny
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021445/IND/2010
Subject(s)
MANUFACTURING PROCESS
PRODUCTION MANAGEMENT
TIME STUDIES
Notes
Appendix : p. 36 - 50
Bibliography : p. 35
Abstract
-
Physical Dimension
Number of Page(s)
xii, 50 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03819/10
(T) 658.5 Set A
-
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh kualitas produk mie instant terhadap loyalitas konsumen melalui kepuasan konsumen mie instant di Surabaya
Klasifikasi inventori dengan ABC/XYZ analysis dan mengoptimalkan safety stock di PT. X
Perancangan sistem MRP II untuk mengurangai keterlambatan delivery barang jadi di PT. Madju Warna Steel
Build-to-order and mass customization
Operations management for competitive advantage
Operations management
Upaya perbaikan proses pencatatan jumlah barang hasil produksi di PT. X
Peningkatan produktivitas dengan metode lean manufacturing di PT. FSCM Manufacturing