Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Potensi penerapan lean construction tools pada proyek konstruksi di Surabaya
Author
Christianto, Steven
Additional Author(s)
Wiyoto, Hermawan Setiawan
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011805/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 76 - 81
Bibliography : p. 69 - 75
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 81 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03615/11
(T) 690.068 Chr P
-
Unavailable : Removed
Similar Collection
by author or subject
Survei tingkat kepuasan penyewa terhadap fasilitas yang disediakan pengelola di gedung perkantoran "X" Surabaya
Studi optimasi perencanaan site layout pada proyek konstruksi dengan menggunakan program quantitative system verson 3.0
Perancangan sistem informasi manajemen proses tender pada proyek konstruksi (studi kasus di PT."X")
Construction production planning and optimal control
Impacts of managerial and operational problems on facility layout arrangement in multi products precasting yards
Analisis pemilihan kontaktor dalam mencapai kinerja proyek
Studi kasus pembuatan shop drawing pada proyek grande water place residences phase 1 Surabaya
Studi harga satuan upah untuk proyek bangunan tinggi