Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Techniques for construction network scheduling
Author
Stevens, James D.
Additional Author(s)
-
Publisher
New York: 1990
Language
English
ISBN
0071009191
Series
McGraw-Hill series in construction engineering and project management
Subject(s)
BUILDING-SUPERINTENDENCE
SCHEDULING (MANAGEMENT)
Notes
-
Abstract
Bibliography: p. 194-195
Physical Dimension
Number of Page(s)
xiii,224p.
Dimension
25 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05214/93
624.068 Ste T
-
Available
Similar Collection
by author or subject
Perbandingan metode hamid, simulated annealing, dan metode heuristik FRB pada penjadwalan flowshop dengan kriteria makespan
Construction superintendent's operations manual
Perbandingan beberapa initial state yang digunakan pada simulated annealing
Scheduling construction projects
Penjadualan produksi flexible flowshops dengan sequence-dependent setup times PT Cahaya Angkasa Abadi.
Perbandingan performance anatara algoritma NEH, BaBH dan DPH dengan kriteria minimal Makespan
Penerapan petri nets pada perancangan jangka pendek dan inisialisasi penjadwalan produksi di PT. Iga Abadi
Managing the construction process