Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PG Rejo Agung Baru Madiun
Author
Prasetyo, Gogot Eko
Additional Author(s)
Arief H., Purnomo
Susanto, Andreas
Publisher
Surabaya: Madison Square Press, 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II
Subject(s)
PRODUCTION ENGINEERING
PRODUCTION MANAGEMENT
SUGARCANE INDUSTRY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
v, 84 p.
Dimension
29 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01915/99
L 621.8 Pra L-II
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa tegangan pada sambungan tekan poros dan hub dengan menggunakan metode elemen hingga
Evaluasi spesifikasi produk relay untuk menurunkan reject operating voltage di PT. Schneider Electric Manufacturing Batam
Perancangan peningkatan kapasitas produksi di PT. XYZ
Upaya peningkatan efisiensi produksi di PT. X
Analisa lead time produksi dan estimasi probabiltas kedatangan material dan produk import di PT. Schering-Plough Indonesia Tbk.
Analisis proses transformasi dan konrol kualitas proses transformasi pada UD. Vialli
Upaya penurunan internal claim dengan metode DMAIC di PT. E-T-A Indonesia
LKP : PT Ace Metal Indonesia