Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan produksi dengan menggunakan pendekatan algoritma genetika, algoritma heuristic rajendran, dan algoritma heuristic ho dan chang di PT. Bintang Adyapastikaglass
Author
Njotowidjojo, Yoko
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0698/IND/2003
Subject(s)
PRODUCTION SCHEDULING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 152 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01141/04
(T) 658.53 Njo P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Construction scheduling
Penjadwalan proyek konstruksi
A comprehensive guide to project management schedule and cost control
Perencanaan bahan baku dan penjadwalan proses produksi di production training centre (PTC)
Penjadwalan di PT. Intertrend Utama
Penjadwalan produksi pada CV. Naga Jaya Plastics di Surabaya
Penjadwalan produksi di PT. Insera Sena
Construction planning and scheduling