Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi tentang pengamatan standar waktu dan produktivitas pekerjaan konstruksi : Studi kasus pada proyek Ruko Gubeng Station selama Bulan September 2003-Nopember 2003
Author
Wibowo, Amelia Andreana
Additional Author(s)
Saputri, Yennie Ony
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1314/SIP/2004
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME STUDY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 87 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01618/04
(T) 690.068 Wib S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Aspek-aspek manajemen usaha
Peningkatan kapasitas produksi pada divisi kalung lumakina kotak dengan metode line balancing dan methods time measurement di PT. Untung Bersama Sejahtera
Pandangan konsultan perencana mengenai kualitas dokumen desain dan faktor-faktor yang mempengaruhinya
Analisis dampak negatif pelaksanaan pembangunan proyek terhadap lingkungan hidpu di sekitarnya
Perencanaan peramalan dan penjadualan di PT Multi Global Makmur
Analisa dan evaluasi sisa material konstruksi pada pembangunan ruko di Surabaya
Produktifitas pekerjaan jacked pile driving dan faktor-faktor yang mempengaruhinya
Penentuan buffer sizing dalam penerapan critical chain project management pada sebuah proyek konstruksi