Studi tentang pengamatan standar waktu dan produktivitas pekerjaan konstruksi : Studi kasus pada proyek Ruko Gubeng Station selama Bulan September 2003-Nopember 2003
Author
Wibowo, Amelia Andreana
Additional Author(s)
Saputri, Yennie Ony
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1314/SIP/2004
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME STUDY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 87 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01618/04
(T) 690.068 Wib S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perbandingan komposisi pekerja pasangan dinding bata antara SNI 2008 dengan kenyataan di lapangan...
Penerapan sistem manajemen lingkungan berdasarkan ISO 14000 pada kontraktor-kontraktor di Surabaya
Scheduling construction projects
Pengendalian jadwal pada proyek bangunan gedung bertingkat di Surabaya dengan metode earned value management dan earned schedule
The Characteristics of innovative construction project: a study in Thailand construction industry
Perbandingan penjadwalan proyek menggunakan kurva "S" dan CPM network pada proyek "X" di Surabaya
Construction scheduling
Perancangan peningkatan produktivitas pada perusahaan aluminium X