Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi tentang pengamatan standar waktu dan produktivitas pekerjaan konstruksi : Studi kasus pada proyek Ruko Gubeng Station selama Bulan September 2003-Nopember 2003
Author
Wibowo, Amelia Andreana
Additional Author(s)
Saputri, Yennie Ony
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1314/SIP/2004
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME STUDY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 87 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01618/04
(T) 690.068 Wib S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan konsistensi data dan pengurangan waktu kerja sistem penilaian mesin dan karyawan di PT. XYZ
Studi kasus perbandingan biaya perancah kayu, gelam dan besi pada proyek ruko di Surabaya
Motion and time study for lean manufacturing
Construction scheduling with primavera project planner
Perencanaan peramalan dan penjadualan di PT Multi Global Makmur
Analisis pendapat kontraktor dan pengembang yang menentukan kesuksesan perusahaan kontraktor (studi perusahaan kontraktor di Surabaya)
Analisa faktor-faktor yang mempengaruhi perencanaan durasi aktifitas dalam proyek koonstruksi
Upaya pencapaian target pada unit single line departemen pengemasan di PT. Ulam Tiba Halim