Studi tentang pengamatan standar waktu dan produktivitas pekerjaan konstruksi : Studi kasus pada proyek Ruko Gubeng Station selama Bulan September 2003-Nopember 2003
Author
Wibowo, Amelia Andreana
Additional Author(s)
Saputri, Yennie Ony
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1314/SIP/2004
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME STUDY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 87 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01618/04
(T) 690.068 Wib S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perbandingan sistem tunggal dan sistem ganda struktur baja rangka terbreis konsentris khusus berbentuk V terbalik dengan direct analysis method
Pengembangan elemen discrete kirchhoff midlin quadrilateral (DKMQ) untuk analisis pelat lipat komposit
Penerapan marketing mix oleh kontraktor pemula di Surabaya
Perencanaan dan pengendalian biaya dan waktu pada suatu proyek konstruksi menggunakan program CCoBMLSE
Penyiapan bill of quantity untuk estimasi biaya pekerjaan konstruksi
Pengujian elemen cangkang yang terdapat dalam program komersial dengan analisis geometri linier dan nonlinier
Studi kasus produktivitas pekerjaan produksi dan pemasangan dinding precast pada proyek apartemen
Analisis komparasi dan pengaruh beberapa variabel terhadap kepuasan hunian dan lokasi citra raya dan graha famili