Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis perbandingan biaya opersi penyediaan energi listrik dengan menggunakan PLN dan PLTU 25 MW di PT. Adiprima Suraprinta Gresik
Author
Hasmonio, Willson
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01010486/ELK/2004
Subject(s)
STEAM POWER PLANTS
STEAM POWER PLANTS-EQUIPMENT AND SUPPLIES
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 67 P.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02509/04
(T) 621.312132 Has A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Mengenal dan memahami proses operasi PLTGU
Evaluasi perancangan sistem proteksi pada PLTU 25 MW di PT. Adiprima Suraprinta Gresik
Analisa balance of plant pembangkit listrik tenaga uap (PLTU) dengan daya 25 mw dan tegangan 6,3 kv pada PT. Prima Elektrik Power
Steam plant operation
Modifikasi high pressure feed water heater 7 di pembangkit listrik tenaga uap Paiton
Studi teknis pengoperasian PLTU 3,9 MW dengan bahan bakar batu bara, serpihan kayu dan potongan veneer di PT. Hendratna Plywood Banjarmasin
Pengendalian operasi PLTU dan PLTGU pada daya nominal efisien, andal dan aman
LKP : PLTU sektor Gresik, Gresik