Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan alat bantu menggunakan metode owas dan rula untuk analisa postural stress pada pekerja PT. Omega Plastik
Author
Lesmana, Teguh
Additional Author(s)
Astrid H., Debora
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 03010847/IND/2004
Subject(s)
INDUSTRIAL ENGINEERING
WORK ENVIRONMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 154 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03711/04
(T) 658.38 Les P
-
Unavailable : Lost
Similar Collection
by author or subject
Teknik penghitungan volume kerja
Pemberdayaan disiplin teknik industri dalam era teknologi informasi
Introduction to industrial and systems engineering
Analisis korelasi motivasi kerja, lingkungan kerja, dan kinerja karyawan PT Harlindo Sejahtera
Operations management
What is coworking?
Engineering for the control of manufacturing
Relasi budaya organisasi, lingkungan kerja non fisik, dan kinerja karyawan pada PT Surya Millinia Abadi Surabaya