Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan alat bantu menggunakan metode owas dan rula untuk analisa postural stress pada pekerja PT. Omega Plastik
Author
Lesmana, Teguh
Additional Author(s)
Astrid H., Debora
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 03010847/IND/2004
Subject(s)
INDUSTRIAL ENGINEERING
WORK ENVIRONMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 154 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03711/04
(T) 658.38 Les P
-
Unavailable : Lost
Similar Collection
by author or subject
Analysis and control of production systems
Closing the gap between practice and research in industrial engineering
Perancangan layout lini perakitan mesin husker di pt agrindo
Studi komparatif kinerja tenaga kerja normal dan tenaga kerja penyandang cacat pada UD. Tiara Handicraft di Surabaya
Product design and development
Introduction to industrial and systems engineering
Pengaruh kecerdasan intelektual, persepsi kecerdasan emosional, persepsi kecerdasan spiritual dan lingkungan kerja terhadap perilaku etis mahasiswa akuntansi pajak Universitas Kristen Petra
Pengaruh lingkungan kerja, organizational commitment, dan kepuasan pada reward terhadap turnover intention di PT Imanuel Tehnik Sentosa