Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan alat bantu menggunakan metode owas dan rula untuk analisa postural stress pada pekerja PT. Omega Plastik
Author
Lesmana, Teguh
Additional Author(s)
Astrid H., Debora
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 03010847/IND/2004
Subject(s)
INDUSTRIAL ENGINEERING
WORK ENVIRONMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 154 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03711/04
(T) 658.38 Les P
-
Unavailable : Lost
Similar Collection
by author or subject
Successful engineering management
Diktat dasar-dasar prinsip industrial engineering
Analisa faktor-faktor yang menyebabkan stres kerja yang dihadapi oleh karyawan perusahaan ultra wahyu Surabaya
Analisa pengaruh lingkungan kerja dan komunikasi yang efektif terhadap kepuasan kerja karyawan bagian pengiriman CV Lima Surabaya
Pengaruh kompensasi dan lingkungan kerja non fisik terhadap prestasi kerja PT. AIA Financial Malang
Closing the gap between practice and research in industrial engineering
Office ergonomics
Perencanaan produksi dan kebutuhan bahan baku di PT. "X"