Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan tenaga kerja bagian paper machine 7 PT. Suparma Tbk Surabaya
Author
Jayaputra, Iwan
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040819/IND/2004
Subject(s)
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 230 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03725/04
(T) 658.54 Jay P
-
Unavailable : Removed
Similar Collection
by author or subject
Pengukuran kinerja biro Administrasi Kemahasiswaan dan Alumni Universitas Kristen Petra
Analisa perbandingan produktivitas proses manual dengan proses progresif di PT Fuboru Indonesia
Upaya pencapaian target pada unit single line departemen pengemasan di PT. Ulam Tiba Halim
LKP : analisa tata letak pabrik perusahaan sepatu UD Happy Surabaya
Studi tentang pengamatan standar waktu dan produktivitas pekerjaan konstruksi
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja stock preparation #1, #2, #3, dan #6 departemen stock preparation PT Suparma Tbk.
Penurunan waktu changeover dengan metode SMED di PT. Schneider Electric Manufacturing Batam-Plant Electro Mechanic
Pengurangan waktu proses intra transportasi menggunakan value stream mapping