Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan tenaga kerja bagian paper machine 7 PT. Suparma Tbk Surabaya
Author
Jayaputra, Iwan
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040819/IND/2004
Subject(s)
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 230 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03725/04
(T) 658.54 Jay P
-
Unavailable : Removed
Similar Collection
by author or subject
Studi eksperimental: mengurangi bias pengukuran umum balanced scorecard dalam penilaian kinerja pada mahasiswa S1 program akuntansi bisnis
Upaya pengalokasian operator in-line QC di PT Smart Tbk.
Niebel's methods, standards, and work design
Perancangan standar kerja untuk mengurangi lead time pengiriman dengan menggunakan metode value stream mapping di PT. Samando
Pengukuran produktivitas kerja karyawan di pabrik kecap cap ratu di Mojokerto
Distribusi chemical di finishing line PT. XYZ
Rancangan perbaikan standar metode kerja berdasarkan micromotion study untuk mengurangi motion waste
LKP : penjadwalan kerja di PT Surya Tedjakusuma