Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan tenaga kerja bagian paper machine 7 PT. Suparma Tbk Surabaya
Author
Jayaputra, Iwan
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040819/IND/2004
Subject(s)
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 230 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03725/04
(T) 658.54 Jay P
-
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan produksi perusahaan sepeda
LKP : mesin pengerusan garam di PT Metalco
Usulan peningkatan kinerja karyawan pada departemen blow molding dan injection molding di PT. X menggunakan metode dilo
Analisa perbandingan produktivitas proses manual dengan proses progresif di PT Fuboru Indonesia
Perencanaan kebutuhan bahan baku pada perusahaan meja setrika
Pengukuran produktivitas pekerjaan dinding lite block dan hebel : studi kasus pada proyek x
Analisa biaya dan pengukuran kerja pada produk amplop dan box file di PT. X
Improving the performance of maintenance department in PT Doulton