Please take a moment to complete this survey below

Library's collection Library's IT development Cancel

Browse by DDC#

17.501 collection(s) found
 
Operations research: an introduction
Author(s)
Taha, Hamdy A.
ISBN
0131738852
Dimension
1 CD-ROM / 4,75 inch.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00657/09CD 658.4034 Tah OLibrary - 5th Floor/ AVAvailable
2.02685/09CD 658.4034 Tah OLibrary - 5th Floor/ AVAvailable
Operations research: an introduction
Author(s)
Taha, Hamdy A.
ISBN
013202313x
Dimension
xviii, 797 p. / 23 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00655/09658.4034 Tah OLibrary - 7th FloorAvailable
2.02684/09658.4034 Tah OLibrary - 7th FloorAvailable
Perancangan dan implementasi sistem manajemen mutu ISO 9001:2000 di UD Gajah Mada Karoseri
Author(s)
Adi, Shelmy Kharisma
ISBN
-
Dimension
xiii, 137 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04689/08658.562 Adi PLibrary - 8th FloorUnavailable : Removed
Preferensi potential customer sandal zandilac terhadap produk sandal jepit, selop, dan metal
Author(s)
Anggraini, Christina
ISBN
-
Dimension
xv, 199 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04688/08658.8343 Ang PLibrary - 8th FloorUnavailable : Removed
Perancangan dan implementasi sistem manajemen mutu berdasarkan ISO 9001:2000 di PT. Primabox Adiperkasa
Author(s)
Wijaya, Charlie Harman
ISBN
-
Dimension
xii, 168 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04687/08658.562 Wij PLibrary - 8th FloorUnavailable : Removed
Improvement for foot sealing area at glost selection department in PT Doulton
Author(s)
Jenni
ISBN
-
Dimension
xvii, 217 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04686/08658.562 Jen ILibrary - 8th FloorUnavailable : Removed
Pengoptimalan alokasi tenaga kerja pada bagian refinery dan fractionation di PT. Smart Tbk.
Author(s)
Susanti, Yulia
ISBN
-
Dimension
xiv, 409 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04685/08658.54 Sus PLibrary - 8th FloorUnavailable : Removed
Upaya pencapaian target pada unit single line departemen pengemasan di PT. Ulam Tiba Halim
Author(s)
Wijaya, Yunita
ISBN
-
Dimension
xix, 318 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04684/08658.54 Wij ULibrary - 8th FloorUnavailable : Removed
Pengukuran waktu kerja di departemen packaging PT Smart. Tbk.
Author(s)
Azteca, Rhenny
ISBN
-
Dimension
xviii, 403 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04683/08658.542 Azt PLibrary - 8th FloorUnavailable : Removed
Perancangan metode dan fasilitas kerja pada bagian inspeksi akhir PT Elco Sidoarjo
Author(s)
Hermanus, Suzana Samelina
ISBN
-
Dimension
xi, 125 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04682/08658.542 Her PLibrary - 8th FloorUnavailable : Removed
Perancangan dan implementasi sistem manajemen mutu ISO 9001:2000 di PT Karya Tugas Anda
Author(s)
Tjahjono, Irine
ISBN
-
Dimension
xix, 326 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04681/08658.562 Tja PLibrary - 8th FloorUnavailable : Removed
Perancangan perbaikan dengan lean manufacturing dalam proses produksi job shop pada PT. Alpha Jaya Manunggal Mandiri
Author(s)
Halim, Anita
ISBN
-
Dimension
xiv, 310 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04680/08658.5 Hal PLibrary - 8th FloorUnavailable : Removed
Strategi pemasaran untuk PT. Siantar Top dengan analisa quality function deployment
Author(s)
Gunawan, Yenny
ISBN
-
Dimension
xv, 151 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04679/08658.8 Gun SLibrary - 8th FloorUnavailable : Removed
Identifikasi kebutuhan perkembangan dunia industri terhadap program S2 teknik industri
Author(s)
Chandra, Hermawan
ISBN
-
Dimension
xv, 84 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04678/08658.5 Cha ILibrary - 8th FloorUnavailable : Removed
Decision support and business intelligence systems
Author(s)
-
ISBN
0131580175
Dimension
xxviii, 772 p. / 25 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00082/09658.4030285 DecLibrary - 7th FloorAvailable
2.03461/10658.4030285 DecLibrary - 7th FloorAvailable
Closing the innovation gap
Author(s)
Estrin, Judy
ISBN
0071499873
Dimension
xiii, 254 p. / 23 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04697/08658.4063 Est CLibrary - 7th FloorAvailable
Skedul kebutuhan sumber daya pada proyek sekolah dengan menggunakan program primavera
Author(s)
Dewabrata, Christopher O.
ISBN
-
Dimension
xiv, 71 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04673/08658.404 Dew SLibrary - 8th FloorUnavailable : Removed
Program komputer untuk penyiapan kebutuhan tenaga kerja dalam proyek konstruksi
Author(s)
Poedjianto, Alroy
ISBN
-
Dimension
xix, 93 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04666/08658.924 Poe PLibrary - 8th FloorUnavailable : Removed
Analisis jadwal pelaksanaan pekerjaan struktur proyek 6 lantai dengan menggunakan program microsoft project 2003
Author(s)
Sutanto, Agus Salim
ISBN
-
Dimension
xvii, 68 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04663/08658.404 Sut ALibrary - 8th FloorUnavailable : Removed
Systems analysis and design
Author(s)
Kendall, Kenneth E.
ISBN
013157986X
Dimension
xxvi, 774 p. / 28 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.05031/08658.4038011 Ken SLibrary - 7th FloorAvailable