Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Monitoring penjadwalan proyek dan evaluasi jumlah tower crane pada proyek condominium dan podium sebuah plaza di tengah kota
Author
Wijaya, Agnes Maria
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012052/SIP/2015
Subject(s)
CONSTRUCTION PROJECTS-MANAGEMENT
TOWER CRANES
SCHEDULING
Notes
Appendix: p. 42-85
. Bibliography: p. 41.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 85 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02626/15
(T) SIP 2052
-
Unavailable : Removed
Similar Collection
by author or subject
Model faktor penyebab risiko terhadap keberhasilan proyek konstruksi
Evaluasi kinerja metode heuristik untuk meminimumkan makespan dalam penjadwalan fleksible flowshop
Perencanaan kebutuhan bahan baku pada perusahaan meja setrika
Penilaian indikator K3L pada penggunaan tower crane
Penjadualan mesin paralel dengan metode dinamis fun (fuzzy-neuro) di PT Supra Aspindo Jaya
Membandingkan algoritma tabu search ben-fawzan dengan solusi awal neh dan algoritma tabu search ben-fawzan dengan solusi awal CDS pada permasalahan Flow shop
Pengukuran dan pemetaan pekerjaan konstruksi
Prefabrication dan modular construction serta pengaruh precast terhadap scheduling proyek