Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan flowshop dengan mempertimbangkan batch size (studi kasus di PT X)
Author
Hoo, Shie Lie
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2012
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021639/IND/2012
Subject(s)
SCHEDULING
WORKFLOW-MANAGEMENT
Notes
Appendix : p. 39-47
Bibliography : p. 38
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 47 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04133/12
(T) 658.53 Hoo P
-
Unavailable : Removed
Similar Collection
by author or subject
The Breeden realty office building construction schedule
Perencanaan kebutuhan bahan baku dan penjadwalan produksi
Penjadwalan sepatu boot berkaitan dengan ukuran dan warna di PT. Toboyo
LKP : PT Wijaya Indonesia Makmur Bicycle Jl. Raya Bambe Km 20 Driyorejo-Gresik
Perancangan penjadualan pada departemen produksi di CV. Kayu Murni
Planning and managing interior projects
Project planning, scheduling, and control
Pengaruh schedule flexibility terhadap turnover intention dengan kepuasan kerja karyawan sebagai variabel perantara di Surabaya Plaza Hotel