Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Tingkat kepentingan risiko dan respon risiko pada tahap pelaksanaan proyek kontruksi
Author
Widjaja, Anton
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2017
Language
Indonesian
ISBN
-
Series
Tesis No. 01000242/MTS/2017
Subject(s)
CONSTRUCTION INDUSTRY-RISK MANAGEMENT
CONSTRUCTION PROJECTS-MANAGEMENT
Notes
Appendix: p. 72-100
. Bibliography: p. 70-71.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 100 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02136/17
(T2) MTS 0242
Library - 8th Floor
Available
Similar Collection
by author or subject
Penyebab tindakan tidak aman (Unsafe Act) pekerja pada suatu proyek konstruksi
Model faktor penyebab risiko terhadap keberhasilan proyek konstruksi
Evaluasi aspek-aspek kinerja owner pada proyek konstruksi
Evaluasi sistem manajemen k3 terhadap metode pemancangan jack-in pile
Survei mengenai biaya overhead serta faktor-faktor yang mempengaruhinya
Engineering construction risks
Pengaruh sistem manajemen k3 terhadap waktu dan biaya proyek
Pengaturan risiko hujan dalam kontrak serta dampak dan kendalanya pada proyek konstruksi