Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Optimasi site layout pada proyek konstruksi caspian tower dengan menggunakan metode metaheuristik berdasarkan traveling distance pekerja
Author
Gosno, Richard Antoni
Additional Author(s)
Evander, Richard
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012177/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
PLAN LAYOUT
Notes
Appendix: p. 74-134
. Bibliography: p. 68-73 .
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 134 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02688/17
(T) SIP 2177
Library - 8th Floor
Available
Similar Collection
by author or subject
Model pengukuran tingkat motivasi dan demotivasi staf teknik perusahaan kontraktor di Surabaya
Peranan manajer proyek sebagai pemimpin dalam membangun kepercayaan pada proyek konstruksi di Surabaya
Strategi sumber daya manusia untuk pekerja konstruksi (staf teknik)
Kriteria-kriteria yang dipakai untuk menentukan pengundangan kontraktor dalam mengikuti tender proyek-proyek Universitas Kristen Petra
Principles of construction management
Studi joint risk management pada proyek konstruksi di Surabaya
Perbandingan aplikasi progam Microsoft Project dan Primavera dalam penjadwalan proyek konstruksi
Studi mengenai faktor-faktor yang dapat meningkatkan produktivitas konstruksi di Surabaya