Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Menurunkan loss time assembling drive chain dengan meningkatkan efektifitas penggunaan laporan harian operator (LHO) di PT. XYZ
Author
Chandra, Frenaldi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 03022062/IND?2017
Subject(s)
TIME MANAGEMENT
TIME STUDY
Notes
Appendix: p. 47-77
. Bibliography: p.46.
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 77 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02819/17
(T) IND 2062
Library - 8th Floor
Available
Similar Collection
by author or subject
Dahulukan yang perlu didahulukan
Pemilihan alternatif sistem penjadualan di PT Solihin Jaya
Time and work load management
Perbaikan kinerja proses produksi cetakan tiang pancang di CV Delta Mas
Evaluasi target pada bagian presshop line tube spot di PT. Inti Pelangi Drumasindo
Perencanaan penjadualan metode heuristic neh dengan memperhatikan biaya waste pada perusahaan plastik
Studi awal waktu pengecoran balok plat pada proyek bangunan bertingkat 6 lantai di Surabaya
Diskriminasi struktur proses produksi dalam domain frekuensi dengan menggunakan transformasi fast fourier serta prngujian kolmogorof smirnov