Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Menurunkan loss time assembling drive chain dengan meningkatkan efektifitas penggunaan laporan harian operator (LHO) di PT. XYZ
Author
Chandra, Frenaldi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 03022062/IND?2017
Subject(s)
TIME MANAGEMENT
TIME STUDY
Notes
Appendix: p. 47-77
. Bibliography: p.46.
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 77 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02819/17
(T) IND 2062
Library - 8th Floor
Available
Similar Collection
by author or subject
Motion and time study
Project Professional 2010
Perancangan metode kerja pada proses penyortiran udang di PT. XYZ
Identifikasi penyebab dan upaya pengurangan flowout reject quality control pada departemen IMM PT. X
Penjadwalan jobshop di CV Sinar Indah Teknik
The Mindgym
Sukses anda terletak pada putaran waktu
Pengurangan waste pada sistem EPAF harian/borongan di HR services PT. X