Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Menurunkan loss time assembling drive chain dengan meningkatkan efektifitas penggunaan laporan harian operator (LHO) di PT. XYZ
Author
Chandra, Frenaldi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 03022062/IND?2017
Subject(s)
TIME MANAGEMENT
TIME STUDY
Notes
Appendix: p. 47-77
. Bibliography: p.46.
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 77 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02819/17
(T) IND 2062
Library - 8th Floor
Available
Similar Collection
by author or subject
Perancangan produksi dan pengendalian persediaan di UD. Kompas
Perhitungan waktu baku dengan berbagai variasi produk di PT. Adicitra Bhirawa
Evaluasi re-layout divisi kabel dan penerapan kaizen divisi filter di PT FSCM Manufacturing Indonesia
Perhitungan waktu baku dan optimalisasi kebutuhan tenaga kerja di PT Smart, Tbk.
LKP : proses produksi di PT Supra Aspindo Jaya
Pengukuran produktivitas pekerjaan dinding hebel studi kasus pada proyek apartemen x
Time-driven activity-based costing
Perbaikan lintasan CU dengan metode line balancing di PT. XYZ