Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Menurunkan loss time assembling drive chain dengan meningkatkan efektifitas penggunaan laporan harian operator (LHO) di PT. XYZ
Author
Chandra, Frenaldi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 03022062/IND?2017
Subject(s)
TIME MANAGEMENT
TIME STUDY
Notes
Appendix: p. 47-77
. Bibliography: p.46.
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 77 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02819/17
(T) IND 2062
Library - 8th Floor
Available
Similar Collection
by author or subject
Penentuan keputusan perawatan forklift pada area finish good PT Charoen Pokphand Feedmill Balaraja
Pengurangan waktu proses intra transportasi menggunakan value stream mapping
LKP : mesin pengerusan garam di PT Metalco
Rancangan perbaikan standar metode kerja berdasarkan micromotion study untuk mengurangi motion waste
Crazy busy
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi stock preparation 5 & 7 PT. Suparma Tbk
Evaluasi target pada bagian presshop line tube spot di PT. Inti Pelangi Drumasindo
Analisa kecukupan jumlah transporter dan rancangan jadwal shift kerja operator di PT Philips Indonesia