Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor-faktor dan cara meningkatkan produktivitas pekerja konstruksi pada high rise building di Surabaya
Author
Lourent, Kevin
Additional Author(s)
Chandradinata, Bernard
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2019
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012301/SIP/2019
Subject(s)
HIGH-RISE APARTMENT BUILDINGS
LABOR PRODUCTIVITY
Notes
Appendix: p. 46-52
. Biubliography: p. 45.
Abstract
-
Physical Dimension
Number of Page(s)
xv, 52 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01233/19
(T) SIP 21-2301 F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi kasus pengukuran pengaruh faktor-faktor terhadap produktivitas pekerja pada proyek konstruksi
Analisis penyebab dan perbandingan faktor-faktor cost overruns terhadap high rise building dan low rise building di Surabaya
Pemimpin yang melayani dalam mengatasi counter-productive work behavior pada hotel X
Pengaruh value added intellectual capital terhadap produktivitas karyawan dan return on asset pada perusahaan jasa yang terdaftar di BEI
Dream paradise condominium
Analisis nilai produktivitas dan labor utilization rate tenaga kerja dengan metode work sampling
Strategic human resource management
The Impact of corporate social responsibility policies towards labor productivity in Indonesia