Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan produksi dengan algoritma ant colony di FSCM Manufacturing Indonesia plant 4
Author
Pranata, Ong Lina
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01011029/IND/2006
Subject(s)
PRODUCTION SCHEDULING
PRODUCTION MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xv, 101 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01661/06
(T) - 658.53 Pra P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa kualitas pengerjaan produk penta floor epoxy pada PT. Bina Adidaya di Surabaya
Perancangan peningkatan kapasitas produksi mesin husker di PT Agrindo
Analisa penurunan hambatan mesin flexo di PT Lestari Karya Makmur
Manajemen produksi/operasi
LKP : PT. Bumi Wijaya Indah Kencana
Production and operations management
Upaya peningkatan kapasitas produksi pada plong manual dan glueing manual di PT. X
Maintenance planning and scheduling