Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan produksi dengan algoritma ant colony di FSCM Manufacturing Indonesia plant 4
Author
Pranata, Ong Lina
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01011029/IND/2006
Subject(s)
PRODUCTION SCHEDULING
PRODUCTION MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xv, 101 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01661/06
(T) - 658.53 Pra P
-
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh penerapan supply chain management dalam peningkatan efektivitas dan efisiensi pada operasional produksi PT. Samator
Operations management
Penjadualan dan inventory control produk-produk job order di PT. X Sidoarjo
Manajemen produksi/operasi
Real process improvement using the CMMI
Upaya penurunan downtime line assembly dengan mengevaluasi sistem total productive maintenance pada PT. XYZ
Penerapan lean system di area QC incoming departemen quality assurance PT FSCM Manufacturing Indonesia plant 4
Perancangan sistem persediaan bahan baku regular di PT E-T-A Indonesia