Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan produksi dengan algoritma ant colony di FSCM Manufacturing Indonesia plant 4
Author
Pranata, Ong Lina
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01011029/IND/2006
Subject(s)
PRODUCTION SCHEDULING
PRODUCTION MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xv, 101 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01661/06
(T) - 658.53 Pra P
-
Unavailable : Removed
Similar Collection
by author or subject
Brand babble
Perbandingan sistem mutu oleh china quality certification (cqc) dengan iso 9001:2000 di PT E-T-A Indonesia
Operations strategy
Perancangan keseimbangan lintasan produksi di PT. XYZ
Pengurangan jumlah produk setengah jadi di PT. SEMB-PEL
Perbaikan sistem pengendalian kualitas di PT. Ilufak Plaskaging
Peningkatan efisiensi work cell inductive sensor untuk produk sinba pada PT Schneider Electric Manufacturing Batam
Upaya penurunan persentase produk cacat dengan metode DMAIC pada proses finishing di PT X