Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa perbandingan kinerja laporan pengadaan material sebelum dan sesudah ERP SAP R/3 diimplementasikan di Domusindo Perdana
Author
Wijaya, Ronald
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01011067/IND/2006
Subject(s)
INVENTORY CONTROL
PRODUCTION MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 151 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01649/06
(T) - 658.787 Wij A
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan tata letak fasilitas dan sistem inventory untuk meningkatkan kapasitas produksi pada departemen Carpenter PT Trias Sentosa, Tbk
Studi deskriptif inovasi proses pada UD. Gampang Ingat
Principles of operations management
Just in time factory
Management produksi
Perbaikan sistem ppic dengan pendekatan mrp ii pada bogasari flour mills
Quality improvement at holloware casting departement in PT Doulton
World-class manufacturing