Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penyiapan bar bending schedule untuk proyek konstruksi
Author
Mayasari S, Lenny
Additional Author(s)
Purwanti, Mita Dwi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20211491/SIP/2006
Subject(s)
BAR BENDING SCHEDULE-COMPUTER PROGRAMS
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix:
Bibliography: p. 175
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 175 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05664/06
(T) - 658.924 May P
-
Unavailable : Removed
Similar Collection
by author or subject
Studi optimasi perencanaan site layout pada proyek konstruksi dengan menggunakan program quantitative system verson 3.0
Faktor-faktor yang mempengaruhi labor turnover dan dampaknya pada proyek konstruksi di Surabaya
Keselamatan kerja dan asuransi kecelakaan kerja pada proyek konstruksi
Studi tentang produktivitas kelompok pekerja pada pekerjaan pasangan bata di proyek perumahan
Perencanaan dan pengendalian biaya dan waktu pada suatu proyek konstruksi menggunakan program CCoBMLSE
Analisis komparasi dan pengaruh beberapa variabel terhadap kepuasan hunian dan lokasi citra raya dan graha famili
A survey of progress characteristics of construction projects in Thailand and Indonesia
Model penilaian sukses proyek konstruksi dengan sasaran performa jadwal