Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengukuran kinerja di PT X dengan metode balanced scorecard
Author
Agusyanti, Leny
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.02041132/IND/2006
Subject(s)
PRODUCTION PLANNING
WORK MEASUREMENT
Notes
Appendix: p. 91 - 103
Bibliography: p. 90
Abstract
-
Physical Dimension
Number of Page(s)
xv, 103 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
07285/06
(T) - 658.5 Agu P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Make-up buy analysis dalam pengadaaan packing set di PT. Dhemar Nusantara
Analisa perencanaan persediaan di PT. Surya Kertas
Penentuan temperatur optimal metode SA-MDJ dibandingkan dengan metode NEH untuk penjadualan flow shop
Perencanaan produksi di PT, "X"
Perancangan buffer size yang optimal dalam mengatasi MRP nervousness dengan memperhatikan tingkat inflasi
Laporan tugas: perencanaan dan perancangan produk future map
Perencanaan produksi cat tembok di PT. Warnatama Cemerlang
Perencanaan produksi dengan mempertimbangkan kapasitas produksi pada CV. X