Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa perbandingan algoritma kombinasi genetic & tabu search dengan metode ant colony pada permasalahan penjadwalan flowshop
Author
Yuanita, Fena
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01011147/IND/2006
Subject(s)
PRODUCTION SCHEDULING
Notes
Appendix: p. 104 - 128
Bibliography: p. 102 - 103
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 128 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
07308/06
(T) - 658.53 Yua A
-
Unavailable : Removed
Similar Collection
by author or subject
Studi tentang vehicle routing problem with time windows (vrptw) dengan menggunakan metode simulated annealing
Scheduling computer and manufacturing processes
Penjadwalan pada permasalahan job shop dengan algoritma disjunctive programming
Penjadwalan produksi pada CV. Naga Jaya Plastics di Surabaya
Speed to market
Penjadwalan produksi dengan menggunakan pendekatan algoritma genetika, algoritma heuristic rajendran, dan algoritma heuristic ho dan chang di PT. Bintang Adyapastikaglass
Scheduling
Perancangan jadwal preventive maintenance yang optimal pada divisi blow moulding di PT X