Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor-faktor lapangan spesifik dan global yang menyebabkan keterlambatan pada tahapan pekerjaan struktur dan arsitek pada proyek berskala besar
Author
Lalitan, Dony
Additional Author(s)
Loanata, Vincentius R.
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011576/SIP/2008
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 62 - 69
Bibliography: p. 60 - 61
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 69 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00554/08
(T) - 658.924 Lal F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Produktivitas alat berat pada pekerjaan galian gedung P1-P2 UK Petra
Analisa faktor-faktor positioning perusahaan kontraktor kelas B (besar) di Surabaya
Elemen segitiga berbasis kriging dengan tegangan kontinu pada titik nodal
Penerapan value engineering pada proyek konstruksi
Studi tentang faktor-faktor yang menentukan besarnya mark up dalam penerapan teori utilitias pada penawaran konstruksi fisik di Surabaya
Analisa faktor-faktor penyebab rework dan tingkat kesulitan pencegahannya pada pekerjaan struktur, finishing, dan mep
Peranan teknologi robotik di proyek konstruksi
Potensi penerapan pmbok untuk kepentingan manajemen konstruksi di Surabaya