Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor-faktor lapangan spesifik dan global yang menyebabkan keterlambatan pada tahapan pekerjaan struktur dan arsitek pada proyek berskala besar
Author
Lalitan, Dony
Additional Author(s)
Loanata, Vincentius R.
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011576/SIP/2008
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 62 - 69
Bibliography: p. 60 - 61
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 69 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00554/08
(T) - 658.924 Lal F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh kinerja tim pelaksana proyek pemerintah bagi pihak kontraktor terkait cash in-flow dalam proyek konstruksi
Skedul kebutuhan sumber daya pada proyek sekolah dengan menggunakan program primavera
LKP : gedung Kampus ITATS
Computer-based construction project management
Studi tentang penggunaan jasa asuransi pada proyek konstruksi di Surabaya
Analisa CPM dan bar-chart dengan menggunakan program microsoft project (Studi kasus bangunan kampus ITN 4 lantai di Malang)
Evaluasi sistem estimasi biaya proyek pada perusahaan kontraktor di surabaya
Penerapan material requirement planning pada suatu proyek konstruksi