Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor-faktor lapangan spesifik dan global yang menyebabkan keterlambatan pada tahapan pekerjaan struktur dan arsitek pada proyek berskala besar
Author
Lalitan, Dony
Additional Author(s)
Loanata, Vincentius R.
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011576/SIP/2008
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 62 - 69
Bibliography: p. 60 - 61
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 69 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00554/08
(T) - 658.924 Lal F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi kasus penjadwalan proyek pada proyek rumah toko X menggunakan microsoft project 2010
Elemen segitiga berbasis kriging dengan tegangan kontinu pada titik nodal
Program simulasi perhitungan kinerja backhoe-dump truck pada pemindahan tanah mekanis
CPM in construction management
Kecelakaan kerja pada pekerjaan beton bertulang akibat faktor manusia
Analisis pengaruh variabel lokasi, produk, harga, promosi, pelayanan dan desain terhadap minat konsumen factory outlet di Surabaya
Analisa pengaruh elemen lansekap terhadap nilai properti berdasarkan persepsi penghuni di kawasan perumahan Surabaya Timur dan Surabaya Barat
Hubungan antara time overruns dan kepuasan konsumen menurut pendapat kontraktor dan pengembang pada proyek perumahan