Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian biaya dan waktu pada suatu proyek konstruksi menggunakan program CCoBMLSE
Author
Santoso, Kevin
Additional Author(s)
Tjandra, Maria Christina
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011731/SIP/2010
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 110 - 114
Bibliography : p. 108 - 109
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 114 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03176/10
(T) 692.5 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi mengenai faktor-faktor yang dapat meningkatkan produktivitas konstruksi di Surabaya
Perencanaan dan pengendalian jadwal proyek: studi kasus proyek X
Construction equipment policy
Perbandingan biaya struktur baja non-prismatis, castellated beam, dan rangka batang
CPM in construction management
Pengaruh kinerja keuangan dan faktor makro ekonomi terhadap return saham perusahaan properti di bursa efek Jakarta
Principles of construction management
Analisis diskriminan dan aplikasi analytical hierarchy process untuk menghitung faktor-faktor yang mempengaruhi mark-up penawaran