Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian biaya dan waktu pada suatu proyek konstruksi menggunakan program CCoBMLSE
Author
Santoso, Kevin
Additional Author(s)
Tjandra, Maria Christina
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011731/SIP/2010
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 110 - 114
Bibliography : p. 108 - 109
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 114 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03176/10
(T) 692.5 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh sistem manajemen k3 terhadap waktu dan biaya proyek
Analisa pengaruh elemen lansekap terhadap nilai properti berdasarkan persepsi penghuni di kawasan perumahan Surabaya Timur dan Surabaya Barat
Studi kasus penerapan metode collapsed as-built terhadap sebuah bangunan perkuliahan di kota Surabaya
Pengukuran tingkat motivasi dan demotivasi pekerja konstruksi pada suatu proyek di Surabaya
Proporsi komponen biaya harga bahan, upah, dan alat pada proyek konstruksi bangunan tinggi
Analisis komparasi dan pengaruh beberapa variabel terhadap kepuasan hunian dan lokasi citra raya dan graha famili
Analisa teori value chain terhadap kompetensi pada perusahaan kontraktor kelas a di Surabaya
Faktor-faktor kesuksesan proyek berdasarkan pendapat manajer proyek