Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian biaya dan waktu pada suatu proyek konstruksi menggunakan program CCoBMLSE
Author
Santoso, Kevin
Additional Author(s)
Tjandra, Maria Christina
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011731/SIP/2010
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 110 - 114
Bibliography : p. 108 - 109
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 114 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03176/10
(T) 692.5 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis bangunan menghitung anggaran biaya bangunan
Analisis faktor penyebab, usaha minimalisasi dan program perhitungan sisa material dinding
Analisa harga satuan pekerjaan bidang pekerjaan umum (AHSP)
Planning and monitoring design work
Aplikasi dan pengembangan sistem pengendalian biaya proyek untuk kontraktor (studi kasus pada suatu proyek rumah tinggal di Surabaya)
Model bobot aktivitas sebagai dasar pendistribusian float
Analisis bangunan menghitung anggaran biaya bangunan
Program optimasi jumlah backhoe- dump truck dalam operasi penggalian tanah mekanis