Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian biaya dan waktu pada suatu proyek konstruksi menggunakan program CCoBMLSE
Author
Santoso, Kevin
Additional Author(s)
Tjandra, Maria Christina
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011731/SIP/2010
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 110 - 114
Bibliography : p. 108 - 109
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 114 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03176/10
(T) 692.5 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi kasus perbandingan berbagai bata ringan dari segi material, biaya, dan produktivitas
Analisa dan evaluasi sisa material konstruksi pada proyek ciputra world Surabaya
Standarisasi jenis pekerjaan dalam rab untuk pekerjaan struktur bangunan tinggi di Indonesia
Studi kasus pengukuran pengaruh faktor-faktor terhadap produktivitas pekerja pada proyek konstruksi
Pengendalian jadwal pada proyek bangunan gedung bertingkat di Surabaya dengan metode earned value management dan earned schedule
Usulan penggunaan short interval planning pada proyek konstruksi
Principles of construction management
Studi perbandingan analisa biaya konstruksi bangunan gedung berdasarkan SNI 2002 dan BOW