Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Model pengukuran tingkat motivasi dan demotivasi pekerja proyek konstruksi di Surabaya...
Author
Kohar, William Denyro
Additional Author(s)
Amelina, Sylvie
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011911/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANGEMENT
MOTIVATION
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Appendix: p. 48-68
. Bibliography: p. 47.
Abstract
-
Physical Dimension
Number of Page(s)
xix, 68 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02650/13
(T) 690.068 Koh P
-
Unavailable : Removed
Similar Collection
by author or subject
Faktor-faktor yang mempengaruhi produktivitas pekerja dalam bidang konstruksi di Surabaya
Kaitan antara entrepreneurial motivation dan persepsi terhadap hambatan pertumbuhan usaha mikro dan kecil pada sektor formal di Jawa Timur
Pengaruh faktor motivasi dalam keberhasilan keselamatan dan kesehatan pada konstruksi bangunan berkelanjutan
Tingkat kepentingan faktor-faktor produktivitas pekerja konstruksi berdasarkan tingkat pengaruh dan tingkat frekuensi
Sukses itu mudah
Studi kasus analisa faktor-faktor penyebab sisa material besi beton dan upaya solusinya pada satu perusahaan kontraktor umum gred 7 di Surabaya
Hubungan overtime dengan produktivitas pekerjaan pembesian (studi kasus pada proyek x, y, dan z)
Ketaatan pelaku konstruksi dalam penerapan keselamatan dan kesehatan kerja (K3) pada sebuah proyek hotel di Selatan Surabaya