Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya peningkatan produktivitas dengan mengurangi waktu tidak produktif pada mesin slitter di PT. Spindo
Author
Anggana, Agus
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri , 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041006/IND/2005
Subject(s)
TIME STUDY
MOTION STUDY
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 70 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00478/06
(T) - 658.542 Ang U
Library - 8th Floor
Under maintenance
Similar Collection
by author or subject
Analisa manajemen waktu terhadap peningkatan produktivitas kerja karyawan PT. Bank "XYZ" di Kotamadya Surabaya
Pengukuran produktivitas pekerjaan dinding lite block dan hebel : studi kasus pada proyek x
Motion and time study design and measurement of work
Perbaikan durasi dan pemenuhan task list aktivitas weekly cleaning pada mesin maker di PT X
Penurunan waktu changeover dengan metode SMED di PT. Schneider Electric Manufacturing Batam-Plant Electro Mechanic
Organizational structure and job description development in work study department and case study in packing department at PT. Doulton
Optimalisasi kapasitas untuk memenuhi perencanaan produksi di PT X
Analisis lead time kontainer dengan simulasi value stream mapping di PT X