Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa perbandingan produktivitas proses produksi antara mesin hidrolik ohtake dengan mesin hidrolik manual di PT Fuboru Indonesia
Author
Gozali, Hendrick
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01040961/IND/2005
Subject(s)
PRODUCTION MANAGEMENT-QUALITY CONTROL
TIME STUDY
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xv, 98 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00648/06
(T) - 658.562 Goz A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perancangan sistem manajemen mutu di PT Surya Plastindo dengan pendekatan ISO 9002
Studi kasus menganalisa waktu pekerjaan pengecoran kolom, balok, plat pada proyek Diparanu Rucitra apartemen lantai 10 dan 11
Perhitungan waktu baku dan analisa kebutuhan tenaga kerja departemen finishing & converting PT Suparma, Tbk
Statistical quality control
LKP : penghitungan waktu baku dan efisiensi operator di PT Wonojati Wijoyo
The QFD book
Perancangan biaya kualitas dan analisa kecacatan produk NCR plano pada mesin jagenberg PT X
Upaya pencapaian target pada unit single line departemen pengemasan di PT. Ulam Tiba Halim