Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penerapan resource allocation dan levelling tenaga kerja dengan menggunakan microsoft project 2010 pada suatu proyek konstruksi
Author
Yani, Victor
Additional Author(s)
Chandra W., Albert
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012008/SIP/2014
Subject(s)
CONSTRUCTION INDUSTRY MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
INDUSTRIAL PROJECT MANAGEMENT-COMPUTER PROGRAMS
Notes
Appendix: p. 45 - 84
. Bibliography: p. 44.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 84 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00548/15
(T) SIP 2008
-
Unavailable : Removed
Similar Collection
by author or subject
Information technology project management
Perbandingan dan penerapan paket program komputer untuk manajemen proyek konstruksi
Ketaatan pelaku konstruksi dalam penerapan keselamatan dan kesehatan kerja (K3) pada sebuah proyek hotel di Selatan Surabaya
Faktor-faktor yang mempengaruhi produktivitas pekerja dalam bidang konstruksi di Surabaya
Perhitungan produktivitas tenaga kerja pekerjaan bekisting dengan metode level of effort
Analisis jadwal pelaksanaan pekerjaan struktur proyek 6 lantai dengan menggunakan program microsoft project 2003
Human resource management in construction projects
Analisis produktivitas jam normal dan jam lembur pada pekerjaan struktur beton bertulang